Everyone  should live his lif . If you stop playing, you will grow old and die . Dreaming is an important factor .Everyone should dream and try to achieve his dreams . You shouldn't die in your bed and you shouldn't wait in you bed for the death to visit you . A lot of people died and they don't know that.  Each person should achieve something good for him and for others ,something he dreamed about . Live your life as possible as you can .People who think about the death are died .Don't let the days pass without any accomplishments . It isn't ashame when you do the things you dream about at any ages . People grew old when they stop dreaming . The story gives us a good example of a woman named Rose , a woman who loves to live her life and nothing stop her .

الاثنين، 21 مايو 2012

Well Status

 Dear Reservior Manager:
 find Attachment For Well Status in Block 22  21 May ,2012


-  Daily Well Status

 

 

 

 

 

 

 

 

 

 

 

1-MEEM Compressors Stopped For 0.5 hrs due to Prod. Sep . Tripped

2-MEEM Wells (17 Prod Wells) Stopped For 0.5 hrs due to Prod. Sep . Tripped

 

 

 

3-AJEX Compressor K-1011stopped for 13 hrs due to Shut in Gas inj Well No.7

4-  Gas injection Well# 7 shut in for 3 hrs to Wellhead Master valve replaced

 

 

 

5 - Tamara Wells ( 6&21&36) stopped for 13 hrs due to (Well#7 SI & K-1011 SD )

6- Water injection well TM211  Stopped for 4 hrs ( BF+FC+FL Flushed w/444 bbls)

7- Water injection wellTM212 Stopped for 4 hrs ( BF+FC+FL Flushed w/430 bbls)

8- Water injection well TM213 Stopped for 4 hrs ( BF+FC+FL Flushed w/226bbls)

9- Water injection wellTM216 Stopped for 4 hrs ( BF+FC+FL Flushed w/339 bbls)

10-Ben Well #33 Stopped for 2 hrs due to SQZ job 

 

 

Thanks

Mohsen A

Reservior Eng

Plant Shut Down

BP Company
Block22                                                                                                                 May 14, 2012





Plant Shut down


Executive Summary:

Block 20 Plant has been shut down, Due to a shortage of electricity supply. Damage has been caused to the M701 Main generator in the field .It was caused by a sudden rip of Fan’s belt.


Introduction:

This report will look at;

The sequence of events.-

Recommendations to avoid future incidents-


Findings:

1- Fan’s belt was ripped at 14:25 PM on Monday May13 in the power plant site in M701 main generator. At 14:30 PM Field plant was shut down, due to a shortage of electricity supply. At 15:00 PM producing wells No.(2,7,9,6,8) were closed at the same time injection Wells No(56,87,88) were closed .

2- At 15:30 Fan’s belt was changed by Tag Subcontractors Company and the plant started to work gradually. By 18:15 PM work finished and all wells have returned to production.


Conclusion:

- Production has returned to usual, and Main generator supposes to be maintained in the few days.


Recommendation:

Company should have bought a backup generator -




Thanks

Mohsen Abubaker

Site Manager
14, May

Gas Volume factor


BP Company
Block22
Tamara Field




Calculation method for Gas volume factor

changing of gas volume factor when changing pressure

Prepared by
Mohsen
Reservior Eng
May 21, 2012 

Relative Permeability

Relative Permeability, definitions

ŸSpecific (absolute) Permeability – measure of rock’s ability to conduct fluid in a one fluid system

ŸEffective Permeability - measure of rock’s ability to conduct an immiscible fluid in a multiple fluid system

ŸRelative Permeability - ratio of the effective permeability to the specific permeability (kro “relative permeability to oil”)
TAWILA  RESERVOIR MODEL


A review of results and methods used in generating the Petrel reservoir model for the Tawila field