Plant Shut down
Executive Summary:
Block 20 Plant has been shut down, Due to a shortage of electricity supply. Damage has been caused to the M701 Main generator in the field .It was caused by a sudden rip of Fan’s belt.
Introduction:
This report will look at;
The sequence of events.-
Recommendations to avoid future incidents-
Findings:
1- Fan’s belt was ripped at 14:25 PM on Monday May13 in the power plant site in M701 main generator. At 14:30 PM Field plant was shut down, due to a shortage of electricity supply. At 15:00 PM producing wells No.(2,7,9,6,8) were closed at the same time injection Wells No(56,87,88) were closed .
2- At 15:30 Fan’s belt was changed by Tag Subcontractors Company and the plant started to work gradually. By 18:15 PM work finished and all wells have returned to production.
Conclusion:
- Production has returned to usual, and Main generator supposes to be maintained in the few days.
Recommendation:
Company should have bought a backup generator -
Thanks
Mohsen Abubaker
Site Manager
14, May
Hello Mohsen,
ردحذفI am happy that I visit your blog. I like very much. Thank you very much for your time posting the different topics. I wish you all the best.
Salam
you are welcome. and it is my pleasure to search for topics and then post them on my blog. this way helps me alot with english learning. Finaly thank you for your time that you spend reviewing our posting.
ردحذفbest regards